Czech heat-pump and solar installers do subsidy paperwork by hand while quoting jobs

Since June 2026, state heating and insulation grants go only to poorer households, and a renovation pass is now required.2 sourcesnovazelenausporam.czNová zelená úsporám 2026 redesign (another site)From 25 June 2026 advance grants up to 400k CZK narrow to vulnerable households, other owners shift to zero-interest loans, and a renovation pass becomes mandatory; applications run to 31 Oct 2029.Subsidy · planobnovy.gov.czNPO call 2/2026 — renovation passport (another site)Up to 50k CZK per family house and 100k per apartment building for a professional renovation assessment, deadline 30 Nov 2026 — newly the gate to NZÚ retrofit money, and new paperwork to automate.Subsidy · Installers handle that paperwork while sizing and pricing each job.2 sourcesY Combinatorycombinator.comautarc (another site)Berlin's operating system for heat-pump and solar installers (YC S24) — heat-load calculation, quoting, subsidy paperwork and project tracking in one tool, in a market whose installer workflows mirror…Company abroad · Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·

Good for Someone who'd like to work with heat-pump and solar installers.

Category
Energy
Entry
Easy
Verified

The opportunity

1/2 · Some pain

Small Czech installation firms size, price and file the subsidy paperwork for the heat pumps and solar panels the state subsidises.2 sourcesY Combinatorycombinator.comautarc (another site)Berlin's operating system for heat-pump and solar installers (YC S24) — heat-load calculation, quoting, subsidy paperwork and project tracking in one tool, in a market whose installer workflows mirror…Company abroad · Y Combinatorycombinator.comNová zelená úsporám (another site)The subsidy programme behind tens of thousands of Czech heat-pump and photovoltaic installs a year — and behind the application paperwork the installers carry.Subsidy ·

  • The state subsidy drives tens of thousands of these installs a year.Y Combinatorycombinator.comNová zelená úsporám (another site)The subsidy programme behind tens of thousands of Czech heat-pump and photovoltaic installs a year — and behind the application paperwork the installers carry.Subsidy ·
  • Hundreds of small installation firms fit them.Y Combinatorycombinator.comautarc (another site)Berlin's operating system for heat-pump and solar installers (YC S24) — heat-load calculation, quoting, subsidy paperwork and project tracking in one tool, in a market whose installer workflows mirror Czechia's.Company abroad ·
  • The installers carry the subsidy paperwork for subsidised jobs.2 sourcesY Combinatorycombinator.comautarc (another site)Berlin's operating system for heat-pump and solar installers (YC S24) — heat-load calculation, quoting, subsidy paperwork and project tracking in one tool, in a market whose installer workflows mirror…Company abroad · Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·

Suggested solution

Build an app for heat-pump and solar installers that sizes the system, prices the job and fills in the subsidy forms.

  1. The installer. Today: Sizes the system in a maker's tool. With the suggested solution: Sizes it in the same app.
  2. The installer. Today: Writes the quote for the job. With the suggested solution: Prices the job from the sizing.
  3. The installer. Today: Prepares the subsidy forms. With the suggested solution: Checks forms pre-filled from the quote.
  4. An accredited specialist. Today: Writes the renovation pass. With the suggested solution: Unchanged: the pass stays a specialist's job.
  5. Who does this is not known. Today: Who files each application with the subsidy fund is not known. With the suggested solution: Unchanged: the app prepares the forms, not the filing.

Not known: who files each application with the subsidy fund.

Why now

0/3 · No deadline

Since June 2026 only poorer households get the state's advance grant, and retrofit money now needs a renovation pass first.2 sourcesnovazelenausporam.czNová zelená úsporám 2026 redesign (another site)From 25 June 2026 advance grants up to 400k CZK narrow to vulnerable households, other owners shift to zero-interest loans, and a renovation pass becomes mandatory; applications run to 31 Oct 2029.Subsidy · planobnovy.gov.czNPO call 2/2026 — renovation passport (another site)Up to 50k CZK per family house and 100k per apartment building for a professional renovation assessment, deadline 30 Nov 2026 — newly the gate to NZÚ retrofit money, and new paperwork to automate.Subsidy ·

  • Homeowners who are not low-income now get a loan, not a grant.novazelenausporam.czNová zelená úsporám 2026 redesign (another site)From 25 June 2026 advance grants up to 400k CZK narrow to vulnerable households, other owners shift to zero-interest loans, and a renovation pass becomes mandatory; applications run to 31 Oct 2029.Subsidy ·
  • Retrofit money now needs a renovation pass, a paid expert assessment.2 sourcesnovazelenausporam.czNová zelená úsporám 2026 redesign (another site)From 25 June 2026 advance grants up to 400k CZK narrow to vulnerable households, other owners shift to zero-interest loans, and a renovation pass becomes mandatory; applications run to 31 Oct 2029.Subsidy · planobnovy.gov.czNPO call 2/2026 — renovation passport (another site)Up to 50k CZK per family house and 100k per apartment building for a professional renovation assessment, deadline 30 Nov 2026 — newly the gate to NZÚ retrofit money, and new paperwork to automate.Subsidy ·
  • Installers handle that paperwork while sizing and pricing each job.2 sourcesY Combinatorycombinator.comautarc (another site)Berlin's operating system for heat-pump and solar installers (YC S24) — heat-load calculation, quoting, subsidy paperwork and project tracking in one tool, in a market whose installer workflows mirror…Company abroad · Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·

Willing to pay

1/2 · Some signs

Czech installer firms already buy installer software, sold per seat, and the state pays for renovation passes.2 sourcesplanobnovy.gov.czNPO call 2/2026 — renovation passport (another site)Up to 50k CZK per family house and 100k per apartment building for a professional renovation assessment, deadline 30 Nov 2026 — newly the gate to NZÚ retrofit money, and new paperwork to automate.Subsidy · Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·

  • One Czech tool sells per seat, per month, with the heat-pump module extra.Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·
  • About 20 solar installer firms run another vendor's solar module.Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·
  • The state pays up to 50,000 CZK toward a family house's renovation pass.planobnovy.gov.czNPO call 2/2026 — renovation passport (another site)Up to 50k CZK per family house and 100k per apartment building for a professional renovation assessment, deadline 30 Nov 2026 — newly the gate to NZÚ retrofit money, and new paperwork to automate.Subsidy ·

Validated abroad

3/3 · Proven in 2+ markets

A Berlin company sells heat-pump and solar installers one tool, from heat-load calculation to the subsidy paperwork.Y Combinatorycombinator.comautarc (another site)Berlin's operating system for heat-pump and solar installers (YC S24) — heat-load calculation, quoting, subsidy paperwork and project tracking in one tool, in a market whose installer workflows mirror Czechia's.Company abroad ·

Where it works: DE, US — operating markets: AT, CH, FR, IT — home market CZDECZUS
  1. autarc (another site)Based in Germany
  2. Reonic (another site)Based in GermanyAlso sells in Austria, Switzerland, France, Italy
  3. Coperniq (another site)Based in United States

Market gap

0/2 · Crowded

Four Czech vendors already sell installer software, including the subsidy paperwork, and one of them is well established.Market checkwue.czWue and three Czech rivals (another site)Wue sells per-seat quoting plus NZÚ documentation to installers at 650 Kč per user a month (200 Kč more for heat pumps); RAYNET, AutoERP and Infina sell into the same firms.Market check ·

New, selling this: AutoERP (Apertia Tech) (since 2004), Infina (since 2018), Wue (since 2022). Established, selling this: RAYNET (since 2004). New, selling something nearby: nobody on file. Established, selling something nearby: nobody on file.

Execution difficulty

3/3 · Easy

Makes it easier

  • Small installation firms buy per seat out of their own money.
  • No licence gates the work.
  • The tool is ordinary software.

Makes it harder

  • Four Czech vendors already sell installer software and the subsidy paperwork.
  • One of them to about 20 solar firms.
  • The subsidy rules were redesigned in June 2026.

Suggested first moves

  1. Sit with ten small heat-pump and solar installers and time how long one quote and one subsidy application take each.
  2. Buy the two leading Czech installer tools, push one real job through each, and write down what they do badly.
  3. Build the heat-load calculation and the digital site survey first, so a firm can size, price and file from one tool.